Worked example
The notes
Mr D Harper, Gateshead: “Swap 2 old rads (back bedroom + lounge) for Type 22 double panels, same size, new TRVs both, drain down + refill, inhibitor, 1 day.”
| Item | Qty | Unit price | Total |
|---|---|---|---|
| Type 22 double panel radiator | 2 each | £85.00 | £170.00 |
| TRV and lockshield set | 2 sets | £22.00 | £44.00 |
| Brackets and fittings | 1 lot | £25.00 | £25.00 |
| Inhibitor | 1 each | £14.00 | £14.00 |
| Labour, 1 day | 7 hours | £50.00 | £350.00 |
- Subtotal
- £603.00
- VAT at 20%
- £120.60
- Total
- £723.60
Example prices for illustration only. Your prices depend on your area, the spec and access, so set your own.
Turn your own notes into a quote like this
Type the job how you'd say it. Workscribe lays it out, prices each line and works out the VAT. Free to try, no account.
Try it freeWhat a radiator replacement quote should include
- Radiator type and size (e.g. Type 22, 600 × 1000)
- Valves: TRVs and lockshields
- Drain down, refill, bleed and inhibitor
- Whether pipework needs altering for a different size
- Disposal of the old radiators
Common mistakes
Assuming the size matches
If the new radiator has different pipe centres, you'll be altering pipework. Say the quote assumes same-size replacements.
Skipping inhibitor on the quote
It's a small cost but it shows the customer you're protecting their system.
Questions
Should I quote per radiator or per job?
+
Per radiator for materials, and labour as a total, works well. The customer can see what one more radiator would add.
Do I need to drain the whole system?
+
Usually yes for radiator swaps. Including the drain down and refill on the quote explains why it takes the time it does.
What VAT applies?
+
Standard rate 20% for most radiator work if you're VAT registered.
General guidance, not legal or technical advice. Check current regulations for your job.
More templates for plumbers & heating engineers
- Boiler Replacement Quote Template (UK) with Worked Example
- Back Boiler to Combi Conversion Quote Template (UK)
- Bathroom Installation Quote Template (UK) with Example
- Powerflush Quote Template (UK): What to Include and an Example
- Unvented Cylinder Installation Quote Template (UK)
- Shower Installation Quote Template (UK) with Worked Example